Completeness Check
Submission incomplete:
1.Scope: According to PCP for Project Activities version 1.0, para 196, a valid CDM-VCR-FORM shall be submitted.
The Board agreed at EB 108 (December 2020), as temporary measures pending CMP guidance at CMP 16, to process requests for issuance of CER for emission reductions achieved on or after 1 January 2021 (paragraph 8 of the EB 108th meeting report). The DOE is required to raise a forward action request (FAR) in its verification report that requires the PP to: (i) apply any GWP values that may be adopted by the CMP for the period from 1 January 2021 in its monitoring reports for any emission reductions achieved by the project activity in that period. The verification and certification report refers to para 7 C and not as required para 8 C. Kindly clarify.

2.There is an inconsistency in the cross-referencing of the monitoring period. The verification and certification report on pages 26 section E.3.6.4. as well as page 29 section G. refers to monitoring period 01/01/2021 to 30/11/2021 with verified CER 312,688 tCO2 and monitoring period 01/01/2021 to 30/11/2021 with verified CER 1,233,466 tCO2, whereas the applicable period is 01/09/2020 to 31/12/2020 for verified CER 312,688 tCO2 and applicable period for verified CER 1,233,466 tCO2 is 01/01/2021 to 30/11/2021.