Completeness Check
Submission incomplete:
1.In line with para 143-149 and para 170-174 of the CDM project cycle procedure for proramme of activities, only changes to the PoA-DD can be submitted under the post-registration changes (PRC) track with the request for issuance. Changes to component project activities shall be done via notification of changes as per section 6.3 of the PCP. Thus, the notification of change is not permissible with the request for issuance.
2.The spreadsheet is in the correct format
The submitted ER spreadsheets requires a Microsoft sign in. Please send a spreadsheet in accessible and verifiable (unprotected) format.
3.There is an inconsistency in the cross-referencing of the inclusion date. The verification and certification report on pages 2 and 10 refers to inclusion date for CPAs 3 to 9 as 30/01/2019, whereas CPAs 3 to 9 were included on 30/05/2019.
1.In line with para 143-149 and para 170-174 of the CDM project cycle procedure for proramme of activities, only changes to the PoA-DD can be submitted under the post-registration changes (PRC) track with the request for issuance. Changes to component project activities shall be done via notification of changes as per section 6.3 of the PCP. Thus, the notification of change is not permissible with the request for issuance.
2.The spreadsheet is in the correct format
The submitted ER spreadsheets requires a Microsoft sign in. Please send a spreadsheet in accessible and verifiable (unprotected) format.
3.There is an inconsistency in the cross-referencing of the inclusion date. The verification and certification report on pages 2 and 10 refers to inclusion date for CPAs 3 to 9 as 30/01/2019, whereas CPAs 3 to 9 were included on 30/05/2019.