17:19 23 Jan 25
Completeness Check
Submission incomplete:
1.Scope: According to PCP v2 para 138(c) a revised PDD (in both clean and track changes version) must be submitted.
Please note that the revised PDD (both in clean and track changes version) must be submitted in VVS.
2.Scope: A verification report has not been submitted with a request for issuance.
Issue: Please note that the verification protocol does not refer to the post-registration changes.
1.Scope: According to PCP v2 para 138(c) a revised PDD (in both clean and track changes version) must be submitted.
Please note that the revised PDD (both in clean and track changes version) must be submitted in VVS.
2.Scope: A verification report has not been submitted with a request for issuance.
Issue: Please note that the verification protocol does not refer to the post-registration changes.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: