Completeness Check
Submission incomplete:
1.There is an inconsistency in the approval date of the post registration changes. The monitoring report refers on section B.2.5 to approved PRC (Permanent changes from registered monitoring plan, or permanent deviation of monitoring from the applied methodologies, standardized baselines or other methodological regulatory documents) with approval date 07/06/2013 whereas section E.4.5. of the verification and certification report does not mention the approval date.


2.Scope: According to PCP for Project Activities para 196 a duly completed CDM-ISS-FORM shall be submitted.
The "Risk acknowledgement and acceptance form"(CDM-RAA-FORM) has not been submitted. Also please note that the RAA form should be referred to in section 2 of the issuance request form.

3.According to PCP for Project Activities version 2.0, para 199, a spreadsheet containing the calculations of emission reductions or net anthropogenic removals must be submitted
Issue: The submitted ER Calculation sheet is corrupted and not possible to open.

4.Scope: According to PCP for Project Activities version 2.0, para 199, a valid CDM-VCR-FORM shall be submitted.
1. We have observed that separate documents have been submitted for these requests. Please note that for twin cases, both requests should have the exact documents for the entire MP, except the issuance form.
2. There is an inconsistency in the cross-referencing of the VVS version. The verification and certification report refers to VVS version 03.0, whereas the request is submitted in VVS version 02.0. Please note that VVS 2 is no longer valid.
3. The Board agreed at EB 108 (December 2020), as temporary measures pending CMP guidance at CMP 16, to process requests for issuance of CER for emission reductions achieved on or after 1 January 2021 (paragraph 8 of the EB 108th meeting report). The DOE is required to raise a forward action request (FAR) in its verification report that requires the PP to update their monitoring reports:
(i) To apply any global warming potential values that may be adopted by the CMP; and
(ii) In accordance with any requirements of the CMP guidance. (i) apply any GWP values that may be adopted by the CMP for the period from 1 January 2021 in its monitoring reports for any emission reductions achieved by the project activity in that period.