22:59 29 Jan 25
Completeness Check
Submission incomplete:
Scope: According to EB48 Annex 68 paragraph 9 (e),cross-referencing and versioning within and between the document must be correct and accurate.
Issue: In particular, the project title is inconsistent in the submitted documents (project view page: "Switching of fuel from Low Sulphur Waxy Residue fuel oil to natural gas at Gangnam branch Korea District Heating Corporation Project", PDD: "Switching of fuel from Low Sulphur Waxy Residue fuel oil (LSWR) to natural gas at heat-only boiler in district heating system"; in the monitoring, certification, and verification reports, both of these project titles are used).
Scope: According to EB48 Annex 68 paragraph 9 (e),cross-referencing and versioning within and between the document must be correct and accurate.
Issue: In particular, the project title is inconsistent in the submitted documents (project view page: "Switching of fuel from Low Sulphur Waxy Residue fuel oil to natural gas at Gangnam branch Korea District Heating Corporation Project", PDD: "Switching of fuel from Low Sulphur Waxy Residue fuel oil (LSWR) to natural gas at heat-only boiler in district heating system"; in the monitoring, certification, and verification reports, both of these project titles are used).
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: