Submission incomplete:
1.There is an inconsistency in the cross-referencing of the estimated amount of emissions (PRC). The PRC ER spreadsheet refers to “116,495” (sheet “Emissions”) and “116,494” (sheet “PDD table summary”).
2.There is an inconsistency in the period of the temporary deviation. The submission page refers to 12/03/2015 – 31/05/2015 whereas the revised documents refer to 12/03/2015 – 30/04/2018. In addition, the PDD refers on page 63 to proposed temporary deviation from “March 2015 to May 2018”.
3.Scope: The cross-referencing and versioning within and between the document are not correct and accurate.
Issue: There is an inconsistency in the cross-referencing of the monitoring report. The verification/certification report on page 30 refers to monitoring report version 3.1 dated 22/12/2019 whereas the monitoring report version 3.1 is dated 22/12/2020.
1.There is an inconsistency in the cross-referencing of the estimated amount of emissions (PRC). The PRC ER spreadsheet refers to “116,495” (sheet “Emissions”) and “116,494” (sheet “PDD table summary”).
2.There is an inconsistency in the period of the temporary deviation. The submission page refers to 12/03/2015 – 31/05/2015 whereas the revised documents refer to 12/03/2015 – 30/04/2018. In addition, the PDD refers on page 63 to proposed temporary deviation from “March 2015 to May 2018”.
3.Scope: The cross-referencing and versioning within and between the document are not correct and accurate.
Issue: There is an inconsistency in the cross-referencing of the monitoring report. The verification/certification report on page 30 refers to monitoring report version 3.1 dated 22/12/2019 whereas the monitoring report version 3.1 is dated 22/12/2020.