Completeness Check
Submission incomplete:
1.Scope: According to PCP v2 para 138(c) a revised PDD (in both clean and track changes version) must be submitted.
The submitted PDD in clean version does not correspond to the submitted PDD in track change. MI
2.Scope: The cross-referencing and versioning within and between the document are not correct and accurate.
Issue:
VR refers to the monitoring report version 4.2 dated 06.12.2013 where as the submitted monitoring report is version 4.3 dated 13.2.2014. MI
1.Scope: According to PCP v2 para 138(c) a revised PDD (in both clean and track changes version) must be submitted.
The submitted PDD in clean version does not correspond to the submitted PDD in track change. MI
2.Scope: The cross-referencing and versioning within and between the document are not correct and accurate.
Issue:
VR refers to the monitoring report version 4.2 dated 06.12.2013 where as the submitted monitoring report is version 4.3 dated 13.2.2014. MI