Completeness Check
Submission incomplete:
Scope: According to EB48 Annex 68 paragraph 9(e), cross-referencing and versioning within and between the document must be correct and accurate.
Issue: The verifier confirms on page 2 of the VR that the monitoring plan is in accordance with the applied approved CDM methodology ,i.e. . And so is stated throughout the documentation. However, page 32 of the VR, item 5.5. Compliance with the monitoring methodology states that the monitoring system is in compliance with the applied methodology AMS I.D (version 10): Grid Connected Renewable Electricity Generation, which is inconsistent with the registered version of the methodology AMS I.D. version 13
Scope: According to EB48 Annex 68 paragraph 9(e), cross-referencing and versioning within and between the document must be correct and accurate.
Issue: The verifier confirms on page 2 of the VR that the monitoring plan is in accordance with the applied approved CDM methodology ,i.e. . And so is stated throughout the documentation. However, page 32 of the VR, item 5.5. Compliance with the monitoring methodology states that the monitoring system is in compliance with the applied methodology AMS I.D (version 10): Grid Connected Renewable Electricity Generation, which is inconsistent with the registered version of the methodology AMS I.D. version 13
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: