20:55 23 Apr 25
Completeness Check
Submission incomplete:
1.Scope: A monitoring report using the form and guidelines for completing the monitoring report form (CDM-MR-FORM) has not been submitted with a request for issuance as required in the completeness check checklist for requests for issuance in line with PCP version 9 para 222.
Issue: The monitoring report (version 2 dated 31/01/17) as referred to in the verification and certification report was not submitted.
2.Scope: A spreadsheet containing emission reduction calculation has not been submitted with a request for issuance as required in the completeness check checklist for requests for issuance in line with PCP version 9 para 222.
Issue: The submitted ER spreadsheet is for project "42.5 MW Wind Power Project by VRL Logistics Ltd in Karnataka State (India)" MP 01/02/2015 to 31/01/2016.
1.Scope: A monitoring report using the form and guidelines for completing the monitoring report form (CDM-MR-FORM) has not been submitted with a request for issuance as required in the completeness check checklist for requests for issuance in line with PCP version 9 para 222.
Issue: The monitoring report (version 2 dated 31/01/17) as referred to in the verification and certification report was not submitted.
2.Scope: A spreadsheet containing emission reduction calculation has not been submitted with a request for issuance as required in the completeness check checklist for requests for issuance in line with PCP version 9 para 222.
Issue: The submitted ER spreadsheet is for project "42.5 MW Wind Power Project by VRL Logistics Ltd in Karnataka State (India)" MP 01/02/2015 to 31/01/2016.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: