14:36 14 Jan 25
Completeness Check
Submission incomplete:
1.Scope: According to PCP v2 para 138(a) a duly completed "Post-registration changes request form"(F-CDM-PRC)must be submitted.
The post-registration changes request form is not submitted.
Please note that the form and related documents to post registration changes must be uploaded through the PRC interface by selecting PRC option.
2.Scope: According to PCP v2 para 182 a signed "CDM project activity issuance request form" (F-CDM-ISS) must be submitted.
Issue: As the request for issuance also contains post registration changes, the DOE is required to click yes for Post registration changes in section 2 of the signed form in order to be able to submit through the PRC interface
1.Scope: According to PCP v2 para 138(a) a duly completed "Post-registration changes request form"(F-CDM-PRC)must be submitted.
The post-registration changes request form is not submitted.
Please note that the form and related documents to post registration changes must be uploaded through the PRC interface by selecting PRC option.
2.Scope: According to PCP v2 para 182 a signed "CDM project activity issuance request form" (F-CDM-ISS) must be submitted.
Issue: As the request for issuance also contains post registration changes, the DOE is required to click yes for Post registration changes in section 2 of the signed form in order to be able to submit through the PRC interface
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: