Completeness Check
Submission incomplete:
1.Scope: According to EB48 Annex 68 paragraph 9 (e), the number of Certified Emission Reductions (CERs), within and between the documents must be correct and accurate.
Issue: Emission reduction sheet in the Calculation RIL Recron spreadsheet refers to the total CO2 Reduction by project activity as 5851 CO2, where as according to the submitted documents the total CO2 should be 5846 CO2.

2.Scope: According to EB48 Annex 68 paragraph 9(f), the crediting period throughout the documentation must be consistent.
Issue: Verification report refers on page 2 to the crediting period 01.02.2009-31.12.2010 which is the monitoring period.