Completeness Check
Submission incomplete:
1.There is an inconsistency of the PRC approval date. The monitoring report as well as the verification and certification report refer to a post-registration change (changes to project design), however do not mention the approval date. Kindly include the approval date of the PRC in both reports in the PRC section.


2.According to PCP for Project Activities version 2.0, para 199, a valid version of the CDM-MR-FORM shall be submitted.
The monitoring report contains a blank page (page 34).

3.Scope: The monitoring period throughout the documentation is not consistent.
Issue: There is an inconsistency in the cross-referencing of the monitoring period. The monitoring report on pages 1 , 2 & 7 refers to monitoring period 01/10/2020 – 31/08/2022 whereas the applicable monitoring period is 01/09/2015 - 31/12/2020.

4.Scope: Cross-referencing and versioning within and between the document is not correct and accurate.
Issue: There is an inconsistency in the cross referencing of the PDD. The verification and certification report on pages 2 and 46 Appendix 3 reference number 18 refers to revised PDD version 3.8 dated 15/08/2023 whereas the monitoring report refers to PDD version 3.7 dated 25/03/2016.

5.Scope: The registration date and the crediting period throughout the documentation are not consistent.
Issue: There is an inconsistency in the cross-referencing of the crediting period. The verification and certification report on page 1 refers to crediting period 01/09/2015 – 31/12/2020 whereas the applicable crediting period is 01/09/2015 - 31/08/2022.