Completeness Check
Submission incomplete:
1.Scope: The number of Certified Emission Reductions (CERs), within and between the documents is not consistent.
Issue: There is an inconsistency of CER between the monitoring report (124,486 CO2 page 1 and 3 and 127,484 CO2 page 53) the verification/certification report (124,486 CO2 page 1 and page 49 and 127,484 CO2 pages 13, 36, 37, 38 and 48) and the signed form/project view page/CER spreadsheet (124,486 CO2).

2.Scope: The cross-referencing and versioning within and between the document are not correct and accurate.
Issue: The verification/certification report does not mention the methodology used on page 1.

3.Scope: The submitted documents are not internally and mutually consistent.
Issue: There is an inconsistency of the crediting period between the VCR (02/09/2010-31/12/2014) and the monitoring report/project view page (02/09/2010 – 30/04/2017).

4.Scope: The submitted documents are not internally and mutually consistent.
Issue: There is an inconsistency of project emission and baseline emission between the monitoring report (baseline emission 137,292 CO2 and 9,808 CO2 project emission) and the verification/certification report (baseline emission 134,605 CO2 and 9,807 CO2 project emission) and the CER spreadsheet (baseline emission 134,604 CO2 and 10,118 CO2 project emission).