09:40 20 Dec 24
Completeness Check
Submission incomplete:
1.Scope: According to PCP v2 para 138(a) a duly completed "Post-registration changes request form"(F-CDM-PRC)must be submitted.
Please note that while the form and related documents to post registration changes have been submitted by the DOE, it is required that the documents be uploaded through the PRC interface by selecting PRC option.
2.Scope: According to PCP v2 para 138(b) an assessment opinion by the DOE must be submitted.
Issue: There is an inconsistency of crediting period between the Validation Opinion (01.06.2006-31.05.2013) and the rest of the documents submitted (26.04.2010-25.04.2017).
3.Scope: According to PCP v2 para 182 a signed "CDM project activity issuance request form" (F-CDM-ISS) must be submitted.
Issue: Please note that the DOE is required to click yes for Post registration changes in section 2 of the signed form in order to be able to submit through the PRC interface.
1.Scope: According to PCP v2 para 138(a) a duly completed "Post-registration changes request form"(F-CDM-PRC)must be submitted.
Please note that while the form and related documents to post registration changes have been submitted by the DOE, it is required that the documents be uploaded through the PRC interface by selecting PRC option.
2.Scope: According to PCP v2 para 138(b) an assessment opinion by the DOE must be submitted.
Issue: There is an inconsistency of crediting period between the Validation Opinion (01.06.2006-31.05.2013) and the rest of the documents submitted (26.04.2010-25.04.2017).
3.Scope: According to PCP v2 para 182 a signed "CDM project activity issuance request form" (F-CDM-ISS) must be submitted.
Issue: Please note that the DOE is required to click yes for Post registration changes in section 2 of the signed form in order to be able to submit through the PRC interface.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: