20:38 12 May 24
Project
10195 :
Small Hydro Power Plant Bugres CEEE
Project title |
Small Hydro Power Plant Bugres CEEE
- project design document (1756 KB) PDD appendices Appendix 1 - Bugres_Cashflow (84 KB) Appendix 2 - Bugres_CER Calculation Sheet (96 KB) Appendix 3 - Bugres Benchmark Analysis (4643 KB) Appendix 4 - Bugres_Common Prctice Analysis (33 MB) - registration request form (421 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
Brazil
, involved indirectly
approval (102 KB)
authorization (102 KB)
Authorized Participants: CEEE-GT ; LUMINA ENGENHRIA E CONSULTORIA LTDA |
Other Parties Involved | n/a |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | LARGE |
Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
Standardized baselines used | N/A |
Amount of Reductions | 5,875 metric tonnes CO2 equivalent per annum |
Fee level | USD 0.0 |
Validation Report |
VVS/VVM version:
VVS 9.0
Validation report (1394 KB) Public availability information Link to information uploaded for public availability |
Modalities of Communication | |
Registration Date | Rejected (view history) info & rep check: concluded |
Crediting Period | 05 Oct 15 - 04 Oct 22 (Renewable) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: