04:03 14 Jan 25
Project
2127 :
Waste Gas based Power Generation Project at Ankit Metal & Power Limited
Project title |
Waste Gas based Power Generation Project at Ankit Metal & Power Limited
- project design document (835 KB) PDD appendices Appendix 1 - IRR 1 (126 KB) Appendix 2 - IRR 2 (74 KB) Appendix 3 - IRR 3 (29 KB) Appendix 4 - IRR 4 (28 KB) Appendix 5 - ER sheet (24 KB) Appendix 6 - 2127_Appendix1.pdf (313 KB) Appendix 7 - 2127_Appendix2.pdf (378 KB) Appendix 8 - 2127_Appendix3.pdf (512 KB) Appendix 9 - 2127_Appendix4.pdf (421 KB) Appendix 10 - 2127_Appendix5.pdf (182 KB) Appendix 11 - 2127_Appendix6.pdf (251 KB) Appendix 12 - 2127_Appendix7.pdf (348 KB) Appendix 13 - 2127_Appendix8.pdf (335 KB) Appendix 14 - 2127_Appendix9.pdf (155 KB) Appendix 15 - 2127_Appendix10.pdf (142 KB) Appendix 16 - 2127_Appendix11.pdf (160 KB) Appendix 17 - 2127_Appendix12.pdf (461 KB) Appendix 18 - 2127_Appendix13.pdf (124 KB) - registration request form (501 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
India
, involved indirectly
approval (472 KB)
authorization (472 KB)
Authorized Participants: Ankit Metal & Power Limited |
Other Parties Involved | n/a |
Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries |
Activity Scale | LARGE |
Methodologies Used |
ACM0012 ver. 2 -
Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
|
Standardized baselines used | N/A |
Amount of Reductions | 26,808 metric tonnes CO2 equivalent per annum |
Fee level | USD 3861.6 |
Validation Report |
Validation report (1317 KB)
Public availability information
Link to information uploaded for public availability |
Modalities of Communication | |
Registration Date | Rejected (view history) |
Crediting Period | 01 Jul 09 - 30 Jun 19 (Fixed) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: