Semirara Coalbed Methane Generation Project
[]
Host party(ies) Philippines
Methodology(ies) ACM0008 ver. 7
Standardised Baselines N/A
Estimated annual reductions* 385,478
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE AENOR INTERNACIONAL, S.A.U.
Period for comments 04 Mar 11 - 02 Apr 11
PP(s) for which DOE have a contractual obligation Endesa Carbono
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (984 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs