Grid Interactive Solar Photovoltaic Power Project in Gujarat
[]
Host party(ies) India
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 40,914
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE PJR CDM
Period for comments 17 Dec 11 - 15 Jan 12
PP(s) for which DOE have a contractual obligation Louroux Bio Energies Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (698 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
•	Why this location has been chosen for this project?
•	Will this project have impact on temperature in surrounding area?
•	What would be impact of negative environmental conditions of area upon project? What would be alternatives in that case?
•	How many skilled/unskilled people from surrounding area will be employed at this project during commissioning and operation? 
•	List of stakeholders present in stakeholder meeting is not attached with PDD.

From
Mahesh Pandya
Environmental Engineer
Paryavaran mitra
502, Raj Avenue, Bhaikakanagar road
Thaltej, Ahmedabad – 380059 India
Telefax - 079-26851321/1801
Submitted by: paryavaranmitra

. Gujarat forum on CDM respectfully submit the following comments on the Project Design Document (PDD) Grid Interactive Solar Photovoltaic Power Project in Gujarat, India envisaged by Louroux Bio Energies Limited (LBEL) We thank the CDM Executive Board and Designated Operation Entity (DOE) for recognizing the integral role of transparency in CDM Validation process, and for taking this comment into consideration.
The project is not appropriate for the following points

o	The direct and indirect employments have been considered as the indicators for the Social and economical well being, but no data has been given regarding the no. of additional direct and indirect employments will be created and no of person days will be created due to the proposed project. 


o	No justification has been given regarding the selection of sites for installation of Solar Energy and how the land was previously used?


o	No study was conducted to assess the impact on the availability of grassland and dependent live stocks on the grassland in the project village and nearby villages and how much grasslands are available for the animals? And is their any negative impact on the availability of the grassland due to the project.

o	For creating awareness for local stakeholder consultation the notice was not published in any newspaper so the information is not widespread and people participation was low. Due to this the consultation is not comprehensive.

o	The project developer has not shown any commitment towards the sustainable development indicators, which are integral part of the CDM Projects. There is no description about the efforts that will be taken for improving the sustainable development in the region.


Gujarat fourm on CDM
Email: gujaratfourmoncdm@gmail.com
Submitted by: Gujarat Forum on CDM


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs