Xitieshan Phase III 60MWp Grid-connected Solar PV Power Generation Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 87,296
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 19 Apr 12 - 18 May 12
PP(s) for which DOE have a contractual obligation CGN Solar Energy (Dachaidan) Development Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1187 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs