Jirau Hydro Power Plant
[]
Host party(ies) Brazil
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 6,180,620
Start date of first crediting period. 01 Jul 13
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 24 Apr 12 - 23 May 12
PP(s) for which DOE have a contractual obligation Energia Sustentável do Brasil S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1333 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (103 KB) submitted by: Jorge Molina Carpio on behalf of Jorge Molina

Comment (99 KB) submitted by: International Rivers on behalf of Philip Fearnside

Comment (213 KB) submitted by: Zachary Hurwitz on behalf of Zachary Huriwtz, International Rivers


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs