Jilin Tongyu Xinglongshan 1C Wind Power Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 114,701
Start date of first crediting period. 01 Jul 12
Length of first crediting period. 7 years
DOE/AE China Environmental United Certification Center Co., Ltd.
Period for comments 15 Oct 11 - 13 Nov 11
PP(s) for which DOE have a contractual obligation Longyuan Tongyu Xinglongshan Wind Power Co.,Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (567 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs