40 MW Bagasse Based Cogeneration at West Kenya Sugar Limited
[]
Host party(ies) Kenya
Methodology(ies) ACM0006 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 107,927
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE JCI
Period for comments 13 Sep 11 - 12 Oct 11
PP(s) for which DOE have a contractual obligation EcoSecurities International Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1701 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
When referring the PDD, the proposed CDM project was based on the expansion of sugar mill. Whilst ACM0006 requests no increase in processing capacity of raw input if projects use biomass residues from a production process.
Submitted by: jia.wan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs