Project 3197 : Aguan biogas recovery from Palm Oil Mill Effluent (POME) ponds and biogas utilisation - Exportadora del Atlántico, Aguan/Honduras
Project title Aguan biogas recovery from Palm Oil Mill Effluent (POME) ponds and biogas utilisation - Exportadora del Atlántico, Aguan/Honduras
- project design document (955 KB)

PDD appendices
Appendix 1 - Enclosure (591 KB)
Appendix 2 - Enclosure 1 (221 KB)
Appendix 3 - Enclosure 2 (275 KB)


- registration request form (316 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties Honduras , involved indirectly approval (192 KB) authorization (192 KB)
Authorized Participants: Exportadora del Atlántico
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
13 : Waste handling and disposal
Activity Scale SMALL
Methodologies Used AMS-III.H. ver. 14 - Methane recovery in wastewater treatment
AMS-I.C. ver. 16 - Thermal energy production with or without electricity
AMS-I.D. ver. 15 - Grid connected renewable electricity generation
Standardized baselines used N/A
Amount of Reductions 30,183 metric tonnes CO2 equivalent per annum
Fee level USD 4536.6
Validation Report Validation report (1758 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Modalities of Communication valid as of 08/09/2011
MoC Annex 2 (Withdraw Project Participant) valid as of 08/09/2011
Registration Date 01 Feb 11 (Date of registration action 18 Jul 11)   (view history)  
Crediting Period 01 Feb 11 - 31 Jan 18 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation