19:14 27 Nov 24
Project
10302 :
Replacement of Main Oil Line (MOL) Pumps at Neelam & Heera Asset of ONGC
Project title |
Replacement of Main Oil Line (MOL) Pumps at Neelam & Heera Asset of ONGC
- project design document (488 KB) PDD appendices Appendix 1 - ER and IRR Spreadsheet (258 KB) - registration request form (403 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
India
, involved indirectly
approval (149 KB)
authorization (149 KB)
Authorized Participants: Oil and Natural gas Corporation (ONGC) Limited |
Other Parties Involved | n/a |
Sectoral scopes |
3 : Energy demand
4 : Manufacturing industries |
Activity Scale | SMALL |
Methodologies Used |
AMS-II.D. ver. 13 -
Energy efficiency and fuel switching measures for industrial facilities
|
Standardized baselines used | N/A |
Amount of Reductions | 10,539 metric tonnes CO2 equivalent per annum |
Fee level | USD 0.0 |
Validation Report |
VVS/VVM version:
VVS 9.0
Validation report (613 KB) Public availability information Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 14/12/2016 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 03/06/2020 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 14/12/2016 |
Registration Date | 15 Jun 16 (view history) completeness check: complete info & rep check: concluded |
Crediting Period | 15 Jun 16 - 14 Jun 26 (Fixed) |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: