Project: 4480 Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia - Request for post-registration changes
Project 4480 Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia
PRC ref PRC-4480-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 14 Oct 11 - 13 Oct 18
Assessment opinion Assessment opinion (171 KB)
Revised PDD Revised PDD (903 KB)   Revised PDD - track changes (916 KB)
Supplementary documents Appendix 1 - 4480 CER calculations.xlsx (43 KB)
Appendix 2 - 4480 investment analysis.xls (142 KB)
Signed form Signed form (181 KB)
DOE clarification DOE clarification 1 - Pangkalan Lesung revised PDD PRC clarification request (clean version).pdf (903 KB)
DOE clarification 2 - Pangkalan Lesung revised PDD PRC clarification request (track changes).pdf (906 KB)
VVS version VVS 2.0
Current status 15 Mar 13 - Approved
Effective approval date: 15 Mar 13
Historic statuses 16 Jan 13 - Published
30 Jan 13 - Awaiting DOE clarifications
08 Feb 13 - DOE clarifications received
08 Feb 13 - Summary note being prepared
22 Feb 13 - Awaiting EB decision