Project: 8150 5X0.8 MW Wind Power Project by Texmo Industries - Request for post-registration changes
Project 8150 5X0.8 MW Wind Power Project by Texmo Industries
PRC ref PRC-8150-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 16 Nov 12 - 15 Nov 22
Assessment opinion Assessment opinion (479 KB)
Revised PDD Revised PDD (427 KB)   Revised PDD - track changes (428 KB)
Supplementary documents
Signed form Signed form (1639 KB)
DOE clarification
VVS version VVS 2.0
Current status 12 Dec 14 - Approved
Effective approval date: 12 Dec 14
Historic statuses 13 Nov 14 - Request published