8488 Lebong Hydroelectric Power Plant
- Request for post-registration changes
Project | 8488 Lebong Hydroelectric Power Plant |
---|---|
PRC ref | PRC-8488-001 |
Process track | Issuance |
DOE | TUV RHEIN |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 14 Dec 12 - 13 Dec 19 |
Assessment opinion | Assessment opinion (903 KB) |
Revised PDD | Revised PDD (1102 KB) Revised PDD - track changes (1104 KB) |
Supplementary documents | |
Signed form | Signed form (70 KB) |
DOE clarification | |
VVS version | VVS 7.0 |
Current status | 10 May 16 -
Approved
Effective approval date: 10 May 16
|
Historic statuses |
11 Apr 16 -
Request published |