Project: 8488 Lebong Hydroelectric Power Plant - Request for post-registration changes
Project 8488 Lebong Hydroelectric Power Plant
PRC ref PRC-8488-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 14 Dec 12 - 13 Dec 19
Assessment opinion Assessment opinion (903 KB)
Revised PDD Revised PDD (1102 KB)   Revised PDD - track changes (1104 KB)
Supplementary documents
Signed form Signed form (70 KB)
DOE clarification
VVS version VVS 7.0
Current status 10 May 16 - Approved
Effective approval date: 10 May 16
Historic statuses 11 Apr 16 - Request published