Project: 3651 Sichuan Longdong 30MW Hydropower Project of China - Request for post-registration changes
Project 3651 Sichuan Longdong 30MW Hydropower Project of China
PRC ref PRC-3651-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 11 Oct 10 - 10 Oct 17
Assessment opinion Assessment opinion (586 KB)
Revised PDD Revised PDD (1001 KB)   Revised PDD - track changes (1002 KB)
Supplementary documents
Signed form Signed form (88 KB)
DOE clarification
VVS version VVS 2.0
Current status 13 Dec 12 - Approved
Effective approval date: 13 Dec 12
Historic statuses 14 Nov 12 - Request published