Project: 2876 Lahendong II-20 MW Geothermal Project - Request for post-registration changes
Project 2876 Lahendong II-20 MW Geothermal Project
PRC ref PRC-2876-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 19 Dec 2009 - 09 Jun 2010

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 19 Dec 09 - 18 Dec 16
Assessment opinion Assessment opinion (486 KB)
Revised PDD Revised PDD (1525 KB)   Revised PDD - track changes (1673 KB)
Supplementary documents Appendix 1 - Lahendong _II_09_10_Spreadsheet Calculation.xls (622 KB)
Signed form Signed form (730 KB)
DOE clarification DOE clarification 1 - Validation Post registration changes Lahendong version 05_tracked changes.pdf (488 KB)
DOE clarification 2 - Formula Diesel Fuel Tank measurement 2009_2010.xls (154 KB)

VVS version VVS 2.0
Current status 18 Dec 13 - Approved
Effective approval date: 18 Dec 13
Historic statuses 24 Sep 13 - Published
05 Nov 13 - Awaiting DOE clarifications
15 Nov 13 - DOE clarifications received
15 Nov 13 - Summary note being prepared
27 Nov 13 - Awaiting EB decision