Project: 6526 Hubei Duhe Pankou Hydropower Plant - Request for post-registration changes
Project 6526 Hubei Duhe Pankou Hydropower Plant
PRC ref PRC-6526-002
Process track Issuance
DOE CTI Certification
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jan 13 - 31 Dec 19
Assessment opinion Assessment opinion (149 KB)
Revised PDD Revised PDD (1038 KB)   Revised PDD - track changes (967 KB)
Supplementary documents Appendix 1 - IRR spreadsheet for the revised PDD and PRC.xls (99 KB)
Appendix 2 - ER Calculation-updated for PRC.xlsx (13 KB)
Signed form Signed form (224 KB)
DOE clarification
Current status 07 Apr 15 - Approved
Effective approval date: 07 Apr 15
Historic statuses 06 Mar 15 - Request published