Project: 7359 PoA for the Reduction of emission from non-renewable fuel from cooking at household level - Request for post-registration changes
Project 7359 PoA for the Reduction of emission from non-renewable fuel from cooking at household level
PRC ref PRC-7359-001
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 30 Nov 12 - 29 Nov 19
Assessment opinion Assessment opinion (1358 KB)
Revised PDD Revised PDD (906 KB)   Revised PDD - track changes (989 KB)
Supplementary documents Appendix 1 - LoA Chad.pdf (741 KB)
Appendix 2 - LOA Dominican Republic.pdf (247 KB)
Appendix 3 - LoA Ivory Coast page full version.pdf (887 KB)
Appendix 4 - LOA Liberia.pdf (353 KB)
Appendix 5 - LoA Rwanda.pdf (374 KB)
Appendix 6 - LOA Sierra Leone.pdf (567 KB)
Appendix 7 - LoA Somalia.pdf (348 KB)
Appendix 8 - Letter of approval Namibia.pdf (221 KB)
Appendix 9 - LoA Zimbabwe.pdf (458 KB)
Appendix 10 - LoA Ghana.pdf (523 KB)
Appendix 11 - Letter of Approval from South Africa.pdf (427 KB)
Signed form Signed form (151 KB)
DOE clarification DOE clarification 1 - CCL 182 A VAL Rep PRC- PoA-7359(after UNFCCC clarifcation) Clean.pdf (1456 KB)
DOE clarification 2 - CCL 182 A VAL Rep PRC- PoA-7359(after UNFCCC clarifcation) TC.pdf (1554 KB)
DOE clarification 3 - Clarification response-PRC-7359-001(final)_14112013.pdf (402 KB)
DOE clarification 4 - CDM PoA DD version 12 with track changes from verion 10 and Yellow from version 11.pdf (1103 KB)
DOE clarification 5 - CDM PoA DD version 12 without track changes.pdf (978 KB)
DOE clarification 6 - DNA confirmation on typo mistake-RCC Lome.pdf (30 KB)
DOE clarification 7 - CDM PoA DD version 13 with track changes from verion 10 and Yellow from version 11.pdf (1096 KB)
DOE clarification 8 - CDM PoA DD version 13 final.pdf (955 KB)
DOE clarification 9 - CCL 182 A VAL Rep PRC- PoA-7359 (after 2nd clarification) tc.pdf (1290 KB)
DOE clarification 10 - CCL 182 A VAL Rep PRC- PoA-7359 (after 2nd clarification) CLEAN.pdf (1391 KB)
DOE clarification 11 - 2nd Clarifcation response-PRC-7359-001(16 Dec) clean.pdf (489 KB)
VVS version VVS 4.0
Current status 17 Feb 14 - Approved
Effective approval date: 10 Feb 14
Historic statuses 10 Oct 13 - Published
03 Dec 13 - Awaiting DOE clarifications
17 Dec 13 - DOE clarifications received
17 Dec 13 - Summary note being prepared
20 Jan 14 - Awaiting EB decision