Project: 1770 Incauca S. A. Fuel Switch from Coal to Green Harvest Residues CDM Project - Request for post-registration changes
Project 1770 Incauca S. A. Fuel Switch from Coal to Green Harvest Residues CDM Project
PRC ref PRC-1770-001
Process track Prior approval
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 15 Oct 09 - 14 Oct 16
Assessment opinion Assessment opinion (313 KB)
Revised PDD Revised PDD (4788 KB)   Revised PDD - track changes (4777 KB)
Supplementary documents
Signed form Signed form (103 KB)
DOE clarification
VVS version VVS 2.0
Current status 30 Dec 13 - Approved
Effective approval date: 26 Dec 13
Historic statuses 19 Nov 13 - Published
19 Nov 13 - Summary note being prepared
05 Dec 13 - Awaiting EB decision