Project: 2108 Gansu Datonghe Tiecheng Hydropower Station Project - Request for post-registration changes
Project 2108 Gansu Datonghe Tiecheng Hydropower Station Project
PRC ref PRC-2108-001
Process track Issuance
DOE CQC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 11 May 09 - 10 May 16
Assessment opinion Assessment opinion (22 KB)
Revised PDD Revised PDD (1086 KB)   Revised PDD - track changes (1178 KB)
Supplementary documents
Signed form Signed form (254 KB)
DOE clarification
VVS version VVS 2.0
Current status 21 May 13 - Approved
Effective approval date: 21 May 13
Historic statuses 22 Apr 13 - Request published