Project: 10375 EnKing International Renewable Energy POA - Request for post-registration changes
Project 10375 EnKing International Renewable Energy POA
PRC ref PRC-10375-001
Process track Prior approval
DOE TÜV SÜD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: Addition or change of technologies/measures with or without addition or change of applied methodologies
Applicable crediting period 06 Apr 18 - 05 Apr 25
Assessment opinion Assessment opinion (196 KB)
Revised PDD Revised PDD (1534 KB)   Revised PDD - track changes (1553 KB)
Supplementary documents
Signed form Signed form (33 KB)
DOE clarification
VVS version VVS-PoA 2.0
Current status 29 Mar 21 - Approved
Effective approval date: 28 Mar 21
Historic statuses 22 Feb 21 - Published
22 Feb 21 - Summary note being prepared
08 Mar 21 - Awaiting EB decision