Project: 3776 Low Pressure Gas Recovery Project of Shandong Changyi Petrochemical Co., Ltd., China - Request for post-registration changes
Project 3776 Low Pressure Gas Recovery Project of Shandong Changyi Petrochemical Co., Ltd., China
PRC ref PRC-3776-001
Process track Prior approval
DOE JQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 03 Mar 2011 - 31 Oct 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 03 Mar 11 - 02 Mar 21
Assessment opinion Assessment opinion (285 KB)
Revised PDD Revised PDD (702 KB)   Revised PDD - track changes (1379 KB)
Supplementary documents Appendix 1 - IRR.xls (131 KB)
Signed form Signed form (143 KB)
DOE clarification DOE clarification 1 - Clarification_PRC-3776-001.pdf (461 KB)
VVS version VVS 2.0
Current status 27 Dec 12 - Approved
Effective approval date: 27 Dec 12
Historic statuses 30 Oct 12 - Published
13 Nov 12 - Awaiting DOE clarifications
22 Nov 12 - DOE clarifications received
22 Nov 12 - Summary note being prepared
06 Dec 12 - Awaiting EB decision