Project: 5342 African Improved Cooking Stoves Programme of Activities - Request for post-registration changes
Project 5342 African Improved Cooking Stoves Programme of Activities
PRC ref PRC-5342-001
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above Changes to the programme boundary to expand geographical coverage, Include additional host Parties
Applicable crediting period 06 Dec 12 - 05 Dec 19
Assessment opinion Assessment opinion (2105 KB)
Revised PDD Revised PDD (1953 KB)   Revised PDD - track changes (2105 KB)
Supplementary documents Appendix 1 - Letter of Approval for Liberia.pdf (212 KB)
Signed form Signed form (37 KB)
DOE clarification DOE clarification 1 - DoE Response Letter.pdf (1119 KB)
DOE clarification 2 - PP Response Letter.pdf (326 KB)
DOE clarification 3 - PRC Validation Opinion- PoA-5342_clean.pdf (1898 KB)
DOE clarification 4 - PRC Validation Opinion- PoA-5342_Track Changes.pdf (2201 KB)
DOE clarification 5 - VVS-updated F-CDM-SSC-PoA-DD clean V4.3.pdf (3920 KB)
DOE clarification 6 - VVS-updated F-CDM-SSC-PoA-DD track change V4.3.pdf (2126 KB)
VVS version VVS 5.0
Current status 17 Jul 14 - Approved
Effective approval date: 16 Jul 14
Historic statuses 10 Apr 14 - Published
28 May 14 - Awaiting DOE clarifications
11 Jun 14 - DOE clarifications received
11 Jun 14 - Summary note being prepared
25 Jun 14 - Awaiting EB decision