Project: 8642 SPP2 Solar Power Project - Request for post-registration changes
Project 8642 SPP2 Solar Power Project
PRC ref PRC-8642-001
Process track Issuance
DOE JQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jan 13 - 31 Dec 19
Assessment opinion Assessment opinion (70 KB)
Revised PDD Revised PDD (1524 KB)   Revised PDD - track changes (3078 KB)
Supplementary documents
Signed form Signed form (82 KB)
DOE clarification
VVS version VVS 7.0
Current status 24 Sep 15 - Approved
Effective approval date: 24 Sep 15