Project: 3366 Waste Heat Recovery and Utilisation for Power Generation Project of Xing’an Conch Cement Company Limited - Request for post-registration changes
Project 3366 Waste Heat Recovery and Utilisation for Power Generation Project of Xing’an Conch Cement Company Limited
PRC ref PRC-3366-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Apr 2011 - 28 Sep 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Apr 11 - 31 Mar 21
Assessment opinion Assessment opinion (260 KB)
Revised PDD Revised PDD (1581 KB)   Revised PDD - track changes (1630 KB)
Supplementary documents
Signed form Signed form (1981 KB)
DOE clarification
VVS version VVS 2.0
Current status 11 Dec 12 - Approved
Effective approval date: 10 Dec 12
Historic statuses 06 Nov 12 - Published
06 Nov 12 - Summary note being prepared
20 Nov 12 - Awaiting EB decision