07:38 25 Nov 24
Project:
6283 Distribution of fuel-efficient improved cooking stoves in Nigeria
- Request for post-registration changes
Project | 6283 Distribution of fuel-efficient improved cooking stoves in Nigeria |
---|---|
PRC ref | PRC-6283-002 |
Process track | Prior approval |
DOE | Carbon Check |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 07 Nov 12 - 06 Nov 19 |
Assessment opinion | Assessment opinion (1111 KB) |
Revised PDD | Revised PDD (1942 KB) Revised PDD - track changes (2006 KB) |
Supplementary documents |
Appendix 1 - 6283 CPA 1 version 6 Clean.pdf (1336 KB)
Appendix 2 - 6283 CPA 1 version 6 trackchanges.pdf (1421 KB) Appendix 3 - 6283 CPA 2 version 2 clean.pdf (2035 KB) Appendix 4 - 6283 CPA 2 version 2 trackchanges.pdf (2117 KB) Appendix 5 - 6283 CPA 3 version 2 clean.pdf (1368 KB) Appendix 6 - 6283 CPA 3 version 2 trackchanges.pdf (1450 KB) Appendix 7 - 6283 CPA 4 version 2 clean.pdf (917 KB) Appendix 8 - 6283 CPA 4 version 2 trackchanges.pdf (998 KB) Appendix 9 - 6283 Sample size calculation SRS.XLSX (34 KB) |
Signed form | Signed form (2071 KB) |
DOE clarification |
DOE clarification 1 - 6283 PoA DD version 11 Clean.pdf (1942 KB)
DOE clarification 2 - 6283 PoA DD version 11 trackchanges.pdf (2006 KB) DOE clarification 3 - CCIPL 462-PRC(PoA 6283)-revised re-UN 23.01.2017 clean.pdf (1091 KB) DOE clarification 4 - CCIPL 462-PRC(PoA 6283)-revised re-UN 23.01.2017 TC.pdf (1588 KB) DOE clarification 5 - CCIPL 462-PRC(PoA 6283)-revised re-UN 15.02.2017 TC.pdf (1118 KB) DOE clarification 6 - CCIPL 462-PRC(PoA 6283)-revised re-UN 15.02.2017 clean.pdf (1111 KB) |
VVS version | VVS 2.0 |
Current status | 16 Mar 17 -
Approved
Effective approval date: 15 Mar 17
|
Historic statuses |
10 Jan 17 -
Published 02 Feb 17 - Awaiting DOE clarifications 15 Feb 17 - DOE clarifications received 15 Feb 17 - Summary note being prepared 23 Feb 17 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: