Project: 5781 Inner Mongolia China Water Group Huade Sandaogou Wind Farm 49.5MW Project - Request for post-registration changes
Project 5781 Inner Mongolia China Water Group Huade Sandaogou Wind Farm 49.5MW Project
PRC ref PRC-5781-001
Process track Issuance
DOE CTI Certification
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Mar 2012 - 28 Feb 2014

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Mar 12 - 28 Feb 22
Assessment opinion Assessment opinion (130 KB)
Revised PDD Revised PDD (696 KB)   Revised PDD - track changes (774 KB)
Supplementary documents
Signed form Signed form (94 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Nov 14 - Approved
Effective approval date: 07 Nov 14
Historic statuses 09 Oct 14 - Request published