Project: 2978 Nam Khoa 3 hydropower project - Request for post-registration changes
Project 2978 Nam Khoa 3 hydropower project
PRC ref PRC-2978-002
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Sep 10 - 31 Aug 17
Assessment opinion Assessment opinion (255 KB)
Revised PDD Revised PDD (552 KB)   Revised PDD - track changes (532 KB)
Supplementary documents
Signed form Signed form (1327 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 Mar 13 - Approved
Effective approval date: 20 Mar 13
Historic statuses 19 Feb 13 - Request published