07:16 01 Dec 24
AM0029:
Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas --- Version 3.0
Submit comments for improvement of this methodology (please login)
Title |
Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas (288 KB)
Tools referenced in this methodology: |
|
---|---|---|
Version number |
|
|
Scale | Large scale | |
Status | Not Active --- replaced by ACM0025 | |
Validity |
Valid from 30 May 08 to 15 Apr 15
Requests for registration can be submitted until 11 Dec 2015 23:59:59 GMT |
|
Sectoral scope(s) | 1 | |
Approval history | NM0080-rev , NM0153 | |
Clarifications* | Approach on “investment analysis” for Greenfield power project investment in Singapore (submitted 11 May 09): AM_CLA_0153 (146 KB) | |
Approach on “investment analysis” for Greenfield power project investment in Singapore (submitted 23 Jul 09): AM_CLA_0158 (64 KB) | ||
Clarification for the project implemented by other entity under a tendered Build, Own and Operate (BOO) Scheme AND the tender organizer/ promoter is the project participant and owns the CERs. (submitted 29 Nov 10): AM_CLA_0194 (166 KB) | ||
Lack of clarity of applicability of AM0029 Ver. 03 to combined cycle power plants utilising waste heat for public heating (submitted 23 Dec 10): AM_CLA_0203 (158 KB) | ||
ldentification of plausible baseline scenarios and calculation of fugitive CHa emissions for CDM projects developed in countries included in the Southern African Power Pool (such as Mozambique) (submitted 10 Dec 13): AM_CLA_0253 (105 KB) | ||
Revisions* | Revision of AM0029 to incorporate Combined Cycle Gas Turbine plants fitted with an extraction-type steam turbine, where, as well as generating electricity, a portion of the steam may be extracted to provide heat (submitted 25 Nov 10): AM_REV_0205 (168 KB) | |
To enlarge the applicability of AM0029 to power plants using secondary fuels beside natural gas and to situations where natural gas is insufficiently available, option 1 (submitted 12 May 11): AM_REV_0214 (184 KB) | ||
To enlarge the applicability of AM0029 to power plants using secondary fuels beside natural gas and to situations where natural gas is insufficiently available, option 2 (submitted 12 May 11): AM_REV_0215 (186 KB) | ||
Previous Versions | ||
Title | Methodology for Grid Connected Electricity Generation Plants using Natural Gas --- Version 2 (282 KB) | |
Version number | 2.0 | |
Validity |
Valid from 02 Nov 07 to 29 May 08
Requests for registration can be submitted until 29 Jan 2009 23:59:59 GMT |
|
Sectoral scope(s) | 1 | |
Clarifications* | Baseline determination and fuel use other than natural gas (submitted 24 Feb 08): AM_CLA_0076 (134 KB) | |
Clarification of AM0029 v1.1 applicability conditions (submitted 25 Apr 08): AM_CLA_0091 (113 KB) | ||
Title | Methodology for Grid Connected Electricity Generation Plants using Natural Gas --- Version 1 (242 KB) | |
Version number | 1.0 | |
Validity |
Valid from 18 May 06 to 01 Nov 07
Requests for registration can be submitted until 01 Jul 2008 23:59:59 GMT |
|
Sectoral scope(s) | 1 | |
Clarifications* | Definition of “New” as per Condition 1 of the applicability (submitted 20 Oct 11): AM_CLA_0224 (160 KB) | |
Revisions* | Amendment of AM0029; Sectoral Scope: 1; 19 May 2006 (submitted 28 Jul 06): AM_REV_0021 (129 KB) | |
Approval history | NM0080-rev |
* Only the requests for clarification and revision that have been clarified by the Meth Panel are displayed. To view all requests for clarification, go to this page. To view all requests for revision, go to this page.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: