Calls for input
Call for input
According to the "Procedure: Direct communication with stakeholders" (version 02.0), the CDM Executive Board invites comments from stakeholders on the issues included in the annotated agenda of a Board meeting. The Board further directed the secretariat to:
- Compile the comments received from the call; and
- Bring the compilation to the attention of the Board for its consideration 122nd meeting at the start of the meeting.
The call for inputs from stakeholders is open from 15 to 23 May 2024, 23:59 (CEST).
Any inputs received will be considered by the Board at the start of its 122nd meeting to be held in Bonn, Germany, from 29 to 31 May 2024
Background
Calls for input help the CDM Executive Board and its panels take into consideration comments submitted from the public.
Call for public inputs archives
-
2024
- Focused call for public inputs on a possible revision of "ACM0002: Grid connected electricity generation from renewable sources" in relation to additionality demonstration for grid connected electricity generation activities" (25 March to 22 April 2024, 23:59 CEST)
- Call for public input on the revision of the small-scale methodology “AMS-I.L.: Electrification of rural communities using renewable energy (ver. 05.0)”, (4 to 18 March 2024, 23:59 CEST).
- Call for public input on "Issues included in the annotated agenda and related annexes of the 121st meeting of the CDM Executive Board" (7 to 14 March 2024, 23:59 (CEST).
-
2023
Call for public input on the revision of the methodology “AM0046: Distribution of efficient light bulbs to households", (17 to 31 October 2023, 23:59 CEST)
Call for public input on the revision of the methodology “AM0113: Distribution of Efficient lamps to households", (17 to 31 October 2023, 23:59 CEST)
Call for public input on the revision of the methodological tool “TOO27: Investment analysis", (17 to 31 October 2023, 23:59 CEST)
Call for public input on the revision of the methodology “AMS-II.C.: Demand-side energy efficiency activities for specific technologies” (17 to 31 October 2023, 23:59 CEST)
Call for public input on the revision of the methodology “AMS-II.J.: Demand-side activities for efficient lighting technologies” (17 to 31 October 2023, 23:59 CEST)
Call for public input on the revision of the methodology “AMS-III.AR.: Substituting fossil fuel-based lighting with more efficient lighting systems", (17 to 31 October 2023, 23:59 CEST) -
2022
+ Call for input on "Issues included in the annotated agenda and related annexes of the 115th meeting of the CDM Executive Board" (23 August to 2 September 2022, 24:00 GMT) - **EXTENDED UNTIL 2 SEPTEMBER 2022**
+ Call for public input on the revision of the methodology “AMS-I.I.: Biogas/biomass thermal applications for households/small users”, (21 February to 7 March 2022, 23:59 CEST)
-
2021
-
2020
+ Call for public input on the revision of the methodology "ACM0003: Partial substitution of fossil fuels in cement or quicklime manufacture", (6 July to 20 July 2020, 23:59 CEST)
+ Call for public input on the revision of the methodology "AMS-II.E: Energy efficiency and fuel switching measures for buildings", (3 to 17 March 2020, 23:59 CEST) - EXTENDED TO 1 APRIL 2020!
-
2019
-
2018
-
2017
+ Call for input on the Information Note “Draft framework for the development of a tool or guidelines to determine standardized baselines (SBLs) for energy efficiency in residential, commercial and institutional buildings”. (24 October to 7 November 2017, 24:00 GMT)
+ Call for input on the Information Note “Draft Framework: Development of new top-down methodology for the efficient operation of public transportation system”. (24 October to 7 November 2017, 24:00 GMT)
+ Call for input on the methodology AMS-III.AK “Biodiesel production and use for transport applications”.
(24 October to 7 November 2017, 24:00 GMT)+ Call for input on the methodology AMS-I.H “Biodiesel production and use for energy generation in stationary applications”. (24 October to 7 November 2017, 24:00 GMT)
+ Call for input on the tool “Demonstration of additionality of small-scale project activities” (TOOL21).
(24 October to 7 November 2017, 24:00 GMT)+ Call for input on the “Tool to calculate baseline, project and leakage emissions from the use of refrigerants” (7 April to 21 April 2017, 24:00 GMT) - EXTENDED TO 5 MAY 2017!
+ Call for input on the “Methodological Framework: Development of new top-down methodology for 2-3 wheeled personal transportation, including infra-structure for bicycles, e-bikes and tricycles” (7 April to 21 April 2017, 24:00 GMT) - EXTENDED TO 5 MAY 2017!
+ Call for input on "Issues included in the annotated agenda and related annexes of the ninety-fourth meeting of the CDM Executive Board" (19 to 26 April 2017, 24:00 GMT)
-
2016
-
2015
+ Call for public input on the draft new consolidated methodology "ACM00XX: Fossil fuel based cogeneration for identified recipient facility(ies)" (10 July to 8 August 2015, 24:00 GMT)
+ Call for public input on the draft revision of "ACM0001: Flaring or use of landfill gas" (10 July to 8 August 2015, 24:00 GMT)
+ Call for public input on the draft revision of "ACM0012: Waste energy recovery" (10 July to 8 August 2015, 24:00 GMT)
+ Call for public input on the draft revision of methodological tool "Tool to determine the baseline efficiency of thermal or electric energy generation systems" (10 July to 8 August 2015, 24:00 GMT)
+ Call for public input on the draft revision of methodological tools “Tool to calculate baseline, project and/or leakage emissions from electricity consumption” and “Tool to determine the mass flow of a greenhouse gas in a gaseous stream” (10 July to 8 August 2015, 24:00 GMT)
+ Call for public input on the information note: Analysis and proposals on the revision of "Tool to calculate emission factor of electricity system" (10 July to 8 August 2015, 24:00 GMT)
+ Call for input on the draft new top-down methodology "SSC_xx: Solar power for at-gate-aircraft" (11 July to 8 August 2015, 24:00 GMT)
+ Call for input on the draft revision of the methodology "AMS-III.D: Methane recovery in animal manure management systems" (11 July to 8 August 2015, 24:00 GMT)
+ Call for input on the draft revision of the methodology "AMS-III.H: Methane recovery in wastewater treatment" (11 July to 8 August 2015, 24:00 GMT)
+ Call for input on the draft revision of the standard “Sampling and surveys for CDM project activities and programme of activities” (11 July to 8 August 2015, 24:00 GMT)
+ Call for input on the draft revision of the guideline “Sampling and surveys for CDM project activities and programmes of activities” (11 July to 8 August 2015, 24:00 GMT)
+ Call for input on the draft revision of the methodology "AMS-II.G: Energy efficiency measures in thermal applications of non-renewable biomass" (12 to 27 May 2015, 24:00 GMT)
+ Call for input on the draft revision of the methodology "AMS-III.AH: Shift from high carbon intensive fuel mix ratio to low carbon intensive fuel mix ratio" (1 April to 12 May 2015, 24:00 GMT)
-
2014
+ Call for public input on the draft revision of methodological tool "Emissions from solid waste disposal sites" (7 to 22 November 2014, 24:00 GMT)
+ Call for input on deliverables of the EB to the CMP (12 to 21 September 2014, 24:00 GMT).
+ Call for input on "Issues included in the annotated agenda of the seventy-ninth meeting of the CDM Executive Board and its annexes" (14 to 21 May 2014, 24:00 GMT)
+Call for inputs on draft revised Project Standard (PS), Validation and Verification Standard (VVS) and Project Cycle Procedure (PCP) (2 to 22 April 2014, 24:00 GMT) -
2013
-
2012-2011
+ Call for input on "Issues included in the annotated agenda of the seventieth meeting of the CDM Executive Board and its annexes"(06 - 11 November 2012, 24:00 GMT)
+ Call for public inputs on the "Draft guidelines for determination of baseline and additionality thresholds for standardized baselines using the performance-penetration approach"(26 September 2012 to 16 October 2012, 24:00 GMT).
+ Call for inputs on the draft "Procedure for the development, revision and clarification of baseline and monitoring methodologies and methodological tools" (26 September to 23 October 2012, 24:00 GMT)
+ Call for inputs on Project Standard (PS), Validation and Verification Standard (VVS) and Project Cycle Procedure (PCP) (24 September to 23 October 2012, 24:00 GMT).
+ Call for input on "Issues included in the annotated agenda of the sixty-ninth meeting of the CDM Executive Board and its annexes" (27 August to 2 September 2012, 24:00 GMT).
+ Call for inputs on the "concept note on database for the cost and efficiency of technologies" (6 - 19 August 2012, 24:00 GMT).
+ Call for input on the draft new methodology SSC-III.BE "Substitution of virgin raw materials and fuels by secondary materials recovered from scrap tires"(23 July to 22 August 2012, 24:00 GMT).
+ Call for inputs on the draft revision of the methodology AMS-II.E "Energy efficiency and fuel switching measures for buildings" (23 July to 22 August 2012, 24:00 GMT)
+ Call for inputs on standardized approaches for determining baselines for measure(s) (23 July 2012 to 1 August 2012, 24:00 GMT).
+ Call for inputs on the standardization of the off-grid component of the "Tool to calculate the emission factor for an electricity system" (23 July 2012 to 1 August 2012, 24:00 GMT).
+ Call for inputs on significant deficiencies(23 July 2012 to 10 August 2012, 24:00 GMT)
+ Call for inputs on sustainable development co-benefits (23 July 2012 to 10 August 2012, 24:00 h GMT)
+ Call for inputs on the revision of the A/R methodological tool "Estimation of carbon stocks and change in carbon stocks of trees and shrubs in A/R CDM project activities" (23 July to 22 August 2012, 24:00 GMT).
+ Call for inputs on draft Guidelines on the application of materiality in verifications(23 July - 10 August 2012, 24:00 GMT)
+ Call for input on sampling standard and best practice examples (18 July - 7 August 2012, 24:00 GMT)
+ Call for input on "Issues included in the annotated agenda of the sixty-eighth meeting of the CDM Executive Board and its annexes" (2-8 July 2012, 24:00 GMT)
+ Call for input on the "Information note Proposed stepwise approach for determining baseline and project emissions for vehicle retrofit projects" (18 June - 29 July 2012, 24:00 GMT)
+ Call for public inputs on draft "Guidelines for establishment of standardized baselines for afforestation and reforestation project activities under the clean development mechanism"(14 May - 4 June 2012, 24:00 GMT)
+ Call for input on planned CDM roundtable consultations in 2012(14-28 May 2012, 24:00 GMT)
+ Call for input on the "Information note on the top-down development of standardized approaches for rural energy supply (biogas)"(14-28 May 2012, 12:00 GMT)
+ Call for input on the "Information note on top-down development of standardized approaches for determining methane emissions in rice field under AMS-III.AU" (14-28 May 2012, 12:00 GMT)
+ Call for input on the draft revision of the methodology AMS-III.D "Methane recovery in animal manure management systems"(14 May to 11 June 2012, 12.00 GMT)
+ Call for input on the draft revision of the methodology AMS-III.G "Landfill methane recovery"(14 May to 11 June 2012, 12.00 GMT)
+ Call for input on the draft revision of the methodology AMS-III.R "Methane recovery in agricultural activities at household/small farm level"(14 May to 11 June 2012, 12.00 GMT)
+ Call for input on the draft revision of the methodology AMS-III.Q "Waste Energy Recovery (gas/heat/pressure) project" (14 May to 11 June 2012, 12.00 GMT)
+ Call for input on "Issues included in the annotated agenda of the sixty-seventh meeting of the CDM Executive Board and its annexes"(23-30 April 2012, 24:00 GMT)
+ Call for input on the draft revised methodology AM0025 "Avoided emissions from organic waste through alternative waste treatment processes — Version 13.0.0" (from 10 April to 20 April 2012)
+ Call for input on the draft revised methodology ACM0010 "Consolidated baseline methodology for GHG emission reductions from manure management systems — Version 5.0 " (from 10 April to 20 April 2012)
+ Call for input on the draft revised methodology ACM0013 "Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology — Version 4.0.0" (from 10 April to 20 April 2012)
+ Call for input on the draft revised methodology ACM0014 "Mitigation of greenhouse gas emissions from treatment of industrial wastewater — Version 4.1.0"(from 10 April to 20 April 2012)
+ Call for input on the draft revised methodological "Tool to determine project emissions from flaring gases containing methane" (from 10 April to 20 April 2012)
+ Call for input on the draft best practices examples(05 March - 05 April 2012, 24:00 GMT)
+ Call for input on the draft revised methodology SSC-II.C "Demand-side energy efficiency activities for specific technologies"(05 March - 05 April 2012, 24:00 GMT)
+ Call for input on the draft new methodology SSC-III.AZ "Energy efficiency and/or energy supply projects in commercial buildings"(05 March - 05 April 2012, 24:00 GMT)
+ Call for input on the definition of "special underdeveloped zones"(05 March - 05 April 2012, 24:00 GMT)
+ Call for public input on the draft methodological tool "Upstream leakage emissions associated with fossil fuel use"(05 March - 05 April 2012, 24:00 GMT)
+ Call for input on "Issues included in the annotated agenda of the sixty-sixth meeting of the CDM Executive Board and its annexes"(13 - 19 February 2012, 24:00 GMT)
+ Call for input on the revised "CDM Accreditation Standard for operational entities"(13 February - 9 March 2012, 24:00 GMT)
+ Call for input on the draft revised methodology AM0030 "PFC emission reductions from anode effect mitigation at primary aluminium smelting facilities"(06-16 February 2012, 24:00 GMT)
+ Call for input on the draft Guidelines for data quality in the establishment of standardized baselines (from 08 December 2011 to 27 January 2012, 24:00 GMT)
+ Call for input on the draft methodological tool "Project and leakage emissions from anaerobic digesters" (from 28 November 2011 to 28 December 2011, 24:00 GMT)
+ Call for inputs on CDM policy dialogue(from 27 October 2011 to 21 January 2012, 24:00 GMT)
+ Call for public input on "Issues included in the annotated agenda of the sixty-fifth meeting of the CDM Executive Board and its annexes"(from 08 November 2011 to 14 November 2011, 24:00 GMT)
+ Call for input on the draft revised methodology AM0031 "Baseline methodology for bus rapid transit projects"(from 14 October 08:00 GMT to 24 October 2011 08:00 GMT 2011)
+ Call for input on the draft revised methodology ACM0001 "Consolidated baseline and monitoring methodology for landfill gas project activities"(from 14 October 08:00 GMT to 24 October 2011 08:00 GMT.)
+ Call for public input on "Issues included in the annotated agenda of the sixty-fourth meeting of the CDM Executive Board and its annexes"(from 10 October to 16 October 2011)
+ Call for inputs on sampling standard(from 07 October to 17 October 2011)
+ Call for inputs on the draft new methodology "Renewable energy power generation in isolated grids" and tool "Project and leakage emissions from composting"(from 30 September 2011 to 10 October 2011)
+ Call for inputs on consideration of suppressed demand in CDM methodologies(from 30 September 2011 to 30 October 2011)
+ Call for inputs on standardized baselines in SSC methodologies for displacing non renewable biomass(from 30 September 2011 until 30 October 2011)
+ Call for input on methodological issues pertaining to (a) energy efficient lighting and/or controls in buildings and (b) solar cookers for households(from 30 September 2011 to 30 October 2011)
+ Call for public input on "Issues included in the annotated agenda of the sixty-third meeting of the CDM Executive Board and its annexes"(from 12 September to 18 September 2011)
+ Call for public input on the draft revised methodology ACM0016 "Baseline Methodology for Mass Rapid Transit Projects"(from 29 August to 8 September 2011)
+ Call for public input on the "Tool to determine methane emissions avoided from disposal of waste at a solid waste disposal site"(from 29 August to 8 September 2011)
+ Call for input on First-of-its-Kind and common practice(from 18 July to 15 August 2011)
+ Call for inputs on the validation process(from 18 July to 15 August 2011)
+ Call for public input on the draft revised methodology AM0023 "Leak detection and repair in natural gas production, processing, transmission, storage and distribution systems and in refinery facilities"(from 7 July to 17 July 2011)
+ Call for public inputs: Identification of common issues in implementation of a registered A/R CDM project activity(from 3 June to 3 July 2011)
+ Call for public inputs on key issues identified in relation to the development of a solar cooker methodology(from 3 June to 3 July 2011)
+ Call for public inputs on sustainability benefits(from 3 June to 3 July 2011)
+ Call for public inputs on a draft methodology for water saving devices (3 June to 16 June 2011)
+ Call for public inputs on the expansion of the usability of the small scale methodology AMS-III.AV "Low greenhouse gas emitting water purification systems"(from 15 April 2011 to 16 May 2011)
+ Call for public input on the draft revised methodology AM0055 "Baseline and monitoring methodology for the recovery and utilization of waste gas in refinery facilities"(from 23 March to 1 April 2011)
+ Call for public inputs on Programme of Activities (PoA)(from 18 February 2011 - 18 March 2011, 24:00 GMT)
+ Call for public inputs on areas and means for direct communication of stakeholders and the Board (from 18 February 2011 - 18 March 2011, 24:00 GMT)
+ Call for public inputs on further expansion of applicability of AMS-III.AJ "Recovery and recycling of materials from solid wastes" (from 18 February 2011 - 18 March 2011, 24:00 GMT)
-
2010
+ Call for public inputs on the draft "Tool for baseline scenario identification and baseline emission calculations"(from 01 December 2010 - 12 January 2011, 24:00 GMT)
+ Call for public inputs on the draft revised "Guidelines on the assessment of investment analysis"(from 01 December 2010 - 12 January 2011, 24:00 GMT)
+ Call for public inputs on the possible introduction of the concepts of materiality and level of assurance in the clean development mechanism(from 17 September - 15 October 2010, 24:00 GMT)
+ Call for public inputs on the draft “Procedures for regarding the correction of significant deficiencies and the excess issuance of CERs”(from 17 September - 8 October 2010, 24:00 GMT)
+ Call for public inputs on focus areas for future practitioner workshops for CDM stakeholders(from 30 July 2010 - 27 August 2010)
+ Call for public inputs on the draft "Consolidated methodology for electricity and heat generation from biomass residues"(from 22 July 2010 - 04 August 2010)
+ Specific aspects of a methodology framework for estimating GHG reductions from replacing fuel-based lighting with LED Systems(from 28 May 2010 - 25 June 2010)
+ "Procedures for appeals in accordance with the CMP requests in paragraphs 42-43 of Decision 2/CMP.5"(from 26 March - 23 April 2010)
+ Draft “Tool to calculate the weighted average cost of capital (WACC)”(from 26 March - 23 April 2010)
+ Small-scale energy efficient lighting and solar water heating methodologies(from 26 March to 12 April 2010)
+ Simplified modalities for demonstrating additionality of small scale renewable energy and energy efficiency project activities(from 26 March to 12 April 2010)
+ Call for inputs on the review of the registration and issuance process (from 12 February 2010 to 5 March 2010)
-
2009
+ Call for inputs on the reasons for no or low application of approved methodologies in CDM project(from 08 June 2009 to 08 July 2009)
+ Call for inputs on draft general guidelines on sampling and surveys(from 01 June 2009 to 01 July 2009)
+ Efficiency in the operation of the CDM and opportunities for improvement(from 30 March to 04 May 2009)
+ DNA call for inputs on Regional Distribution matters(from 30 March to 04 May 2009)
+ Draft "Tool to determine the baseline efficiency of thermal or electrical energy generation systems" (from 18 February 2009 to 31 March 2009, 24:00 GMT)
-
2008
+ Elaboration of CDM Accreditation Requirements(from 29 September to 27 October 2008, 24:00 GMT)
+ Flexibility in the application of the definition of project boundary to A/R CDM project activities(from 06 August to 03 September 2008, 24:00 GMT)
+ Proposal for an enhanced barrier test for project activities that have a potentially high profitability without CER revenues(from 06 August to 03 September 2008, 24:00 GMT)
+ Programme of Activities (PoA)(from 06 August to 03 September 2008, 24:00 GMT)
+ Draft standardization of the format of the modalities of communications between project participants and the Executive Board(from 06 August to 03 September 2008, 24:00 GMT)
+ Call for public comments on Clean Development Mechanism Validation and Verification Manual (CDM-VVM)(from 16 May to 15 June 2008, 24:00 GMT)
+ Call for public inputs on the Guidelines for completing the project design document (CDM-PDD), and the proposed new baseline and monitoring methodologies (CDM-NM) (from 19 March to 30 April 2008, 24:00 GMT)
-
2007
+ Call for public inputs on the draft tool for the estimation of emissions from cultivation of biomass(from 25 June to 06 August 2007)
+ Call for inputs requesting non-binding best practice examples on the demonstration of additionality to assist the development of PDDs, in particular for SSC project activities(from 25 June to 31 July 2007)
+ Call for Public Inputs on the draft procedure to demonstrate the eligibility of lands for A/R project activities under the CDM(from 7 May to 18 June 2007)
+ Call for public inputs on simplified baseline methodologies for small-scale CDM afforestation or reforestation project activities applied on wetlands and settlements(from 20 February to 14 May 2007)
+ Proposals for methodologies for SSC CDM project activities that propose the switch from non-renewable biomass to renewable biomass, addressing issues related to leakage, differentiation between renewable and non-renewable biomass and consistency with paragraph 7 (a) of decision 17/CP.7(from 15 January to 16 April 2007)
+ New procedures to demonstrate the eligibility of lands for afforestation and reforestation project activities under the clean development mechanism(from 01 January to 21 February 2007)
+ DOE submissions of request for revisions of approved methodologies (from 3 November 2006 to 3 January 2007)
-
2006
+ Double counting(from 02 October to 20 October 2006)
+ CDM Bazaar(from 12 September to 28 September 2006)
+ AM0016(from 19 May to 16 June 2006)
+ AM0006(from 19 May to 16 June 2006)
+ Definition of policy and programme of activities(from 19 May to 16 June 2006)
+ Revised procedure for accrediting operational entities by the Executive Board of the CDM(from 15 May to 15 June 2006)
+ Double counting (from 06 January to 17 February 2006)
-
2005
-
2004
+ Inputs received on approved meth AM0001 (from 22 September to 7 October 2004)
Offset now: visit the United Nations Carbon Offset Platform