Project 8282 : 9MW Pure Low Temperature Waste Heat Recovery and Utilisation for Power Generation Project of Linxiang Conch Cement Company Limited
Project title 9MW Pure Low Temperature Waste Heat Recovery and Utilisation for Power Generation Project of Linxiang Conch Cement Company Limited
- project design document (856 KB)

PDD appendices
Appendix 1 - 8282 IRR Calculation (80 KB)
Appendix 2 - 8282 CER Calculation (80 KB)


- registration request form (758 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved directly approval (161 KB) authorization (161 KB)
Authorized Participants: Linxiang Conch Cement Company Limited, National Development and Reform Commission of the People’s Republic of China
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used ACM0012 ver. 4 - Consolidated baseline methodology for GHG emission reductions from waste energy recovery projects
Standardized baselines used N/A
Amount of Reductions 40,745 metric tonnes CO2 equivalent per annum
Fee level USD 6649.0
Validation Report VVS/VVM version: VVM 1.2
Validation report (1705 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 18/09/2013
Registration Date 25 Feb 13 (Date of registration action 03 Jun 13)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 25 Feb 13 - 24 Feb 23 (Fixed)
Requests for Issuance
and related documentation