Project 4807 : Energy Efficient Power Generation by Nabha Power Limited
Project title Energy Efficient Power Generation by Nabha Power Limited
- project design document (1473 KB)

PDD appendices
Appendix 1 - 4807 Board Resolution dtd 22.09.2009 (41 KB)
Appendix 2 - 4807 Board Resolution dtd 17.03.2010 (572 KB)
Appendix 3 - 4807 Baseline and Additionality (493 KB)
Appendix 4 - 4807 CER Calculation (3899 KB)


- registration request form (548 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties India , involved indirectly approval (974 KB) authorization (974 KB)
Authorized Participants: Nabha Power Limited
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0013 ver. 3 - Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology
Standardized baselines used N/A
Amount of Reductions 936,451 metric tonnes CO2 equivalent per annum
Fee level USD 185790.2
Validation Report Validation report (1771 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)  
Crediting Period 01 May 14 - 30 Apr 24 (Fixed)