Project 4129 : Xiying River Shuangyaowan I 5.6MW Hydropower Project
Project title Xiying River Shuangyaowan I 5.6MW Hydropower Project
- project design document (403 KB)

PDD appendices
Appendix 1 - ER calculation sheet (82 KB)
Appendix 2 - IRR calculation sheet (195 KB)


- registration request form (117 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (899 KB) authorization (899 KB)
Authorized Participants: Wuwei City Yongquan Power Generation Co., Ltd.
Other Parties Involved United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (46 KB) authorization (46 KB)
Authorized Participants: Climate Bridge Ltd. ; Noble Carbon Credits Limited (withdrawn)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodologies Used AMS-I.D. ver. 15 - Grid connected renewable electricity generation
Standardized baselines used N/A
Amount of Reductions 19,378 metric tonnes CO2 equivalent per annum
Fee level USD 2375.6
Validation Report Validation report (794 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 15/08/2013
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 29/04/2014
MoC Annex 2 (Withdraw Project Participant) valid as of 11/02/2013
Registration Date 11 Feb 11 (Date of registration action 09 May 11)   (view history)  
Crediting Period 01 May 11 - 30 Apr 18 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation