Finalized requests for deviation

In accordance with the current Procedures for requests for deviation a Designated Operation Entity may submit request for deviation regarding a project activity at the validation or verification stage.

Requests for deviation by DOEs and the responses provided by the Board are being made publicly available on this page, unless otherwise decided. The requests for deviations from the monitoring plan have the following code "I-DEV0XXX" and the deviations from an approved methodology have the following code "M-DEV0XXX".

If you are a DOE, please log in if you wish to submit a new request.


Reference of deviation request I/M-DEV
Type of request
Status
Concerned methodology
Reference of project (for requests at verification)

There are 327 matching requests:

Displaying 41-60 of 327

Reference Request for deviation Current Status Last update
I-DEV0425 1. Monitoring the Stack gas flow rate on a daily basis instead of continous basis. 2. Deviation from direct monitoring of biogas to boiler (as recommended (FAR#1) by the DOE through 3rd verification report dated 05/05/2009) Deviation accepted 05 Sep 11
I-DEV0424 Adjustment in generation data during tests of Poechos II project. Deviation accepted 15 Sep 11
I-DEV0423 AWMS Methane Recovery Project MX06-S-34, Coahuila and Durango, México Deviation accepted 08 Nov 11
I-DEV0422 AWMS Methane Recovery Project MX06-S-50, Puebla, México Deviation accepted 17 Nov 11
I-DEV0421 AWMS Methane Recovery Project MX06-S-63, Durango, México Deviation accepted 08 Nov 11
I-DEV0420 AWMS Methane Recovery Project MX06-S-49, Veracruz, México Deviation accepted 08 Nov 11
I-DEV0419 Deviation for adjustment of the monitoring and calculation of baseline emissions Deviation accepted 03 Aug 11
I-DEV0418 0528 Shri Bajrang WHR CDM Project: Deviation for a period from July 2010 to Jan 2011 Deviation accepted 03 Aug 11
I-DEV0417 Request for Deviation from the Monitoring Plan of the Registered PDD for the Monitoring Period under consideration Deviation accepted 14 Jul 11
I-DEV0416 Request for deviation for missing total biogas data Deviation accepted 07 Jul 11
I-DEV0415 Deviation from Monitoring Plan for parameters (a) volume of wastewater treated and (b) electricity consumed by project activity equipment Deviation accepted 08 Sep 11
I-DEV0414 Deviation from the monitoring plan for monitoring parameter ID 13 “ Amount of chemical oxidizing agents entering the system boundary” regarding the monitoring frequency and the power imported from grid. Deviation accepted 20 Jun 11
I-DEV0412 Request for deviation in the approach to determine the value for the parameter “Feed Water Load” (ID No. – D3(b) – 2.5) in absence of the monitored data for the same parameter as per the requirement of registered PDD Deviation accepted 28 Dec 11
I-DEV0409 Deviations on i) the monitoring point of COD of POME leaving closed tank digesters, ii) frequency of monitoring of COD in the project activity, iii) monitoring of biogas Calorific Value, and iv) method of measurement for loss of biogas from pipeline Deviation accepted 09 Jun 11
I-DEV0408 Deviation from Monitoring Plan for parameters (a) volume of wastewater treated and (b) electricity consumed by project activity equipment Deviation accepted 28 Jun 11
I-DEV0407 Deviation from Monitoring Plan for parameters (a) volume of wastewater treated and (b) electricity consumed by project activity equipment Deviation accepted 28 Jun 11
I-DEV0406 Request for deviation for missing electricity meter, measuring the electricity consumption for the ancillary decanter facility Deviation accepted 03 May 11
I-DEV0405 Use of redundant energy measurements instead of primary measurements for estimating baseline emissions Deviation accepted 28 Jun 11
I-DEV0404 The parameter “Total amount of electricity imported to meet project requirement” has not been archived electronically monthly as stated in the MP of the registered PDD. Electricity import is however continuously measured by an electricity meter and the equipment keeps the data of the accumulated electricity. Deviation accepted 03 May 11
I-DEV0403 The parameter FGT was not monitored according to the RMP (presented together with this deviation) during period of time (4 months, 01/06/2009 to 30/09/2009) and not in compliance with the methodology ACM0007 version 1. Deviation accepted 08 Jun 11