Finalized requests for deviation

In accordance with the current Procedures for requests for deviation a Designated Operation Entity may submit request for deviation regarding a project activity at the validation or verification stage.

Requests for deviation by DOEs and the responses provided by the Board are being made publicly available on this page, unless otherwise decided. The requests for deviations from the monitoring plan have the following code "I-DEV0XXX" and the deviations from an approved methodology have the following code "M-DEV0XXX".

If you are a DOE, please log in if you wish to submit a new request.


Reference of deviation request I/M-DEV
Type of request
Status
Concerned methodology
Reference of project (for requests at verification)

There are 327 matching requests:

Displaying 261-280 of 327

Reference Request for deviation Current Status Last update
I-DEV0124 Consideration of electricity consumption by small consumer connected to transmission line of project activity and not explained in registered PDD and validation report
I-DEV0120 Deviation from registered PDD for using Infrared online analyzer for measuring N2O concentration in gaseous effluent (N2O_GE)
I-DEV0115 Pansan Coal Mine Methane Utilization and Destruction Project
M-DEV0113 Request for deviation from the AM0025 applicability condition
I-DEV0112 Estimation of the BOD5 of the treated sludge for calculation of leakage instead of direct monitoring
I-DEV0111 Estimation of the BOD5 of the treated sludge for calculation of leakage instead of direct monitoring
I-DEV0109 Inclusion of diesel generation in the project boundary
I-DEV0106 Frequency of accuracy check of energy meter
I-DEV0105 Frequency of accuracy check of energy meter
I-DEV0104 Frequency of accuracy check of energy meter
M-DEV0103 LDCommodities deviation ER heat
I-DEV0099 Wrong equation in methodology AM0024
I-DEV0098 Procedure for determining project Specific Steam Consumption Ratio (SSCR) for those days when production is out of Normal production range (±5 % of verifiable name plate production capacity)
I-DEV0089 Frequency of logging electricity meter readings
I-DEV0083 Consideration of additonal project emissions
I-DEV0082 Deviation of registered PDD and approved methodology AM0010 version 01 with regard to the measurement of LFG flow and clarification of sold electricity, including the minor amendments in consistency with actual installed status.
M-DEV0078 Beatrix Methane Capture Project
M-DEV0074 Deviation for not meeting one of the applicability clause of methodology “Natural gas is sufficiently available in the region and country…”
I-DEV0073 Determination of project activity leakage
I-DEV0072 Determination of project activity leakage