Project: 1005 Gansu Diebu Niaojiaga 12.9 MW Hydropower Station Project - Crediting Period Renewal Request
[]
Project 1005: Gansu Diebu Niaojiaga 12.9 MW Hydropower Station Project

- project design document (2222 KB)

PDD appendices
Appendix 1 - 1005_Niaojiaga_ER Sheet.xls (88 KB)

- crediting period renewal form (31 KB)
Methodologies Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
VVS Version
Standardized baselines used N/A
Amount of Reductions 41,616 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (918 KB)
Renewal Date 28 Feb 14 (Renewable)   (view history)  
Crediting Period (requested for renewal) 14 May 14 - 13 May 21

Other crediting period(s): 14 May 07 - 13 May 14
Requests for Issuance
and related documentation