12:26 25 Mar 23
Project:
5136 CGN Guangdong Duanfen Wind Power Project
- Crediting Period Renewal Request
[]
| Project |
5136: CGN Guangdong Duanfen Wind Power Project
- project design document (1063 KB)
PDD appendices Appendix 1 - ER calculation 5136 (14 KB)
- crediting period renewal form (152 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 20 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 57,160 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (431 KB)
|
| Renewal Date | 16 Sep 20 (Renewable) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period (requested for renewal) |
31 Dec 19 - 30 Dec 26
Other crediting period(s): 31 Dec 12 - 30 Dec 19 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER calculation 5136
Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: